Recent structural and architectural work across Chicago and the Midwest. Each project shows our scope — what we designed, what we sealed, and what role we played.

Recent structural and architectural work across Chicago and the Midwest — what we designed, what we sealed, and the role we carried on each project.


Commercial & Mixed-Use


U-Haul Storage Facility - Forest Park, IL - 2022

New construction of a SIX-story STORAGE FACILITY

  • Provided structural drawings required to obtain the construction permit for a new six-story 133 ft x 163 ft storage facility.

  • Building construction: Steel floor framing with concrete deck; Metal panel facade


Pete's Fresh Market — New Lenox, IL — 2023–2026

New construction of a 71,000 sq. ft. supermarket. Structural engineer of record (architect: Aria Group Architects)

  • Complete structural permit set — foundations, roof framing, rooftop equipment support, mezzanines, and stair framing

  • Reinforced masonry block and brick exterior walls; steel framing with glass curtain wall at the storefront; steel joist and joist girder roof framing with metal deck

  • Ongoing construction administration, including submittal review, field coordination, and structural certifications for the building department and fire district


LaQuinta Hotel - Justice, IL - 2020

NEW CONSTRUCTION OF A FOUR-STORY HOTEL

  • Worked with the architect on feasibility studies during the preliminary design phase.

  • Provided structural drawings required to obtain the construction permit.

  • Building construction:

    • Prefabricated wood trusses supported on wood stud walls.

    • Steel framing at first-floor lobby and front entrance canopy.


Industrial & Manufacturing

For further information on our Industrial & Manufacturing services, click here.


Electrical Equipment Manufacturing Campus — Chicago, IL — Ongoing

Ongoing on-call structural and architectural engineering

  • Multi-building campus support across 12+ structures

  • New 15,000 sq. ft. steel-framed building addition — clear-span framing off the existing building, columns detailed for a future crane runway, provisions for a future mezzanine, fire-rated separation at the adjoining building, and demolition of the existing exterior wall to join the two structures

  • Overhead crane installations and supporting structure

  • Rooftop equipment support and roof framing reinforcement

  • Masonry openings, column removal, and floor infills

  • Underground stormwater detention system

  • Parking structure and site improvements

  • Planned Development coordination for campus expansion

  • Permitting


12,000 SF PRE-ENGINEERED METAL BUILDING — CHICAGO - Permitting

Architect and structural engineer of record

  • 80' x 150' building with 20' eave, manufacturer-supplied shell

  • Foundation design to manufacturer frame reactions

  • Architectural permit documents, code, and life safety analysis

  • Independent verification of frame reactions before fabrication release

  • Construction administration including submittal review and coordination


PRECISION MANUFACTURING FACILITY — PALATINE, IL - 2026

Equipment and crane foundation design and interior build outs Foundation analysis for a high-pressure waterjet cutting system

  • Foundation design for a new 20-ton overhead crane system, including new spread footings at each column line

  • Slab-on-grade capacity evaluation for forklift traffic and storage racking

  • Coordination with the site geotechnical investigation, including slab coring and subgrade verification

  • New toilet rooms — architectural, mechanical, electrical, and plumbing design

  • Permitting and construction administration


Residential & Multi-Family


Vine Street Station - 2024

Adaptive Re-Use of Existing School to Multi-Family Residential Building:

Provided structural engineering and construction administration services.

  • Addition of new 1st-floor framing in gymnasium

  • Reinforcement of existing floor framing

  • Addition of new hanging balconies

  • Conversion of basement into garage including new openings for overhead door and retaining walls for new drive

  • Roof framing reinforcement for new RTUs

  • Construction administration including submittal reviews drawing updates for field changes


The Edison — 5200 N Sheridan Rd, Chicago, IL — 2023–2026

Facade violation response, repair design, and critical examination

  • Responded to a City of Chicago exterior wall violation with a condition assessment, repair recommendations, and a proposed repair timeline

  • Prepared masonry repair drawings with elevation-by-elevation repair schedules covering tuckpointing, lintel and shelf angle repair, flashing, and window frames

  • Conducted the Chicago Facade Ordinance critical examination of all twelve elevations of this 8-story, 96-foot 1928 masonry building, using boom lifts and swing stages

  • Documented concealed conditions exposed during the owner's repair program and responded to Department of Buildings review comments

See our Chicago Facade Ordinance services here.


5540-5544 W. Montrose - 2018-2020

NEW CONSTRUCTION OF (2) SIX-FLAT APARTMENT BUILDINGS

Provided architectural, structural, MEP, and civil engineering services, and managed the construction on behalf of the owner.

  • Delivered required documentation for the rezoning process and assisted with the rezoning community meeting

  • Provided construction drawings and obtained the permits

  • Performed construction management services


Institutional & Community


Saint George Greek Orthodox Church - Chicago -2018

Interior renovation: Provided structural specifications for the following:

  • Underpinned existing foundations

  • Repaired crawl space

  • Reinforced column foundations

  • Repaired exterior walls

  • Reinforcement/repaired first and second-floor framing


Saint John Chrysostomos Greek Orthodox Monastery - Wisconsin - 2019

Library addition to existing building:

  • Coordinated with the architect from schematic design through design development on a stone-clad library addition infilled between two existing buildings.

  • Designed the steel roof framing, columns, and foundations, including connections to the existing masonry structures on both sides and footings doweled into the existing foundations.

  • Prepared the sealed structural drawings (Wisconsin P.E.) that obtained the construction permit.